Korean Retro Jeans Men'S Curved Knife Pants Design Sense Vintage Casual Straight Leg Pants Loose Large Pocket Wide Leg Pants
Korean Retro Jeans Men'S Curved Knife Pants Design Sense Vintage Casual Straight Leg Pants Loose Large Pocket Wide Leg Pants
In stock
Couldn't load pickup availability
Standard Free Shipping: 4–8 business days
Courier company:
- ✔ Refund if package lost
- ✔ Refund if items damaged
- ✔ 5$ Coupon for late delivery
Product Description
SPECIFICATIONS
Applicable Scene: CASUAL
Applicable Season: Spring And Autumn
Brand Name: NONE
CN: Fujian
Choice: yes
Closure Type: Zipper Fly
Country Preference: General
Craft of Weaving: Tatting
Elasticity: Non Strech
Fabric Type: Denim
Gender: Men
High-concerned chemical: None
Item Type: JEANS
Jeans Style: Straight Jeans
Length: full length
Material: POLYESTER
Origin: Mainland China
Pant Length(cm): full length
Sleeve Length(cm): Sleeveless
Special Size: Standard Size
Style: Korean
Waist: Mid Waist
Waist Type: MID
Wash: No
size_info: {"sizeInfoList":[{"length":{"cm":"S","inch":"S"},"size":"S","vid":-35},{"length":{"cm":"M","inch":"M"},"size":"M","vid":-36},{"length":{"cm":"L","inch":"L"},"size":"L","vid":-37},{"length":{"cm":"XL","inch":"XL"},"size":"XL","vid":-38},{"length":{"cm":"XXL","inch":"XXL"},"size":"XXL","vid":-39},{"length":{"cm":"XXXL","inch":"XXXL"},"size":"XXXL","vid":-40}]}







Share
